The building has not been completed yet. The house was not commissioned. The house is lined with red facing bricks, inside, for insulation, lined in one and a half rows, with old bricks. There is electricity 380 volts. Iron doors and iron gates to the basement. There is a new boiler for heating. The area is 60 sq.m. And organize cryptocurrency mining for "cheap" electricity.